Installation Guide For Poles & FootingsUpdated 6 months ago
We recommend that shade sail poles are installed with a 5° lean out away from the centre of the sail (direction of pull). This must be taken into account when positioning the poles.
If using steel poles it is advisable to have a galvanised coating to prevent rust. If using timber poles it is advisable to use treated timber.
Poles can be painted to match your shade sail or surrounding environment. Once you have chosen the correct size poles and measured the position of them, dig holes to the required size.
Lay a 100mm of medium size gravel at the base of the hole, compact to form a solid pad OR pre-set 100mm of concrete.
Poles should be embedded in concrete footings with a minimum of 20Mpa concrete.
The concrete must be mixed to the manufactures’ instructions or supplied by a certified concrete supplier. Position each pole at a 5° angle leaning out away from the centre of the shade sail and add concrete, ensure the pole remains in the correct position.
The top of the concrete surface should be sloping away from the pole to assist with water drainage. You may require bracing while concrete sets. Poles should be left for at least 72 hours to allow the concrete to set.
Please download our Guide for Poles & Footing's document for more detailed instruction.